How to choose a colocation provider in Canada: a 10-point checklist

E-Book
Posted
10.02.2026
Posted by Hut8

To choose a colocation provider, compare each shortlisted site on ten points: data residency, design standard, power per rack, cooling, power resilience, uptime SLA, connectivity, security, multi-site failover, and configurations and deployment time.

Ask every provider the same questions, in writing, and ask for a facility spec sheet per site.

  • Use the checklist below as the core of your RFP
  • Each point includes the question to ask and how Hut 8's five Canadian data centres answer it.

The 10-point colocation checklist

The 10-point colocation checklist

#
Ask the provider
Why it matters
Hut 8 Canada's answer
1
Where is my data hosted?
Residency and regulatory fit
Canadian facilities, supporting PIPEDA data residency
2
Is the Tier rating designed or certified?
A design rating describes intent, not the as-built site
KEL1 and GTA1 Tier III designed; GTA2, VAN1, VAN2 Tier I designed
3
How many kW per rack, and how much is available now?
Sets what fits in one cabinet
Up to 135 kW (KEL1), 135+ kW (GTA1); 5 MW available now
4
What cooling, and is liquid cooling supported?
Dense hardware needs more than air
KEL1 and GTA1 liquid-cooling capable
5
What is the power path and generator runtime?
Decides how the site rides through an outage
2N power at KEL1 and GTA1; >24 h generator runtime at every site
6
What uptime SLA, and who watches the site?
Your recourse and your early warning
99.99% uptime SLA and a 24/7 NOC at every site
7
Is it carrier-neutral, and which carriers are on net?
Choice of network and price competition
Carrier-neutral; 100G ports and dark fibre; up to five carriers (GTA1)
8
Which certifications and physical controls?
Evidence for your auditors
SOC 2 Type II, NIST assessed (case by case), card and biometric access, 24/7 NOC-monitored CCTV
9
Can I fail over to a second site on the same network?
Resilience without a second provider
Vancouver sites fail over to Kelowna, about 270 km away
10
What configurations, support and deployment timeline?
Fit today and room to grow
Half rack, full rack or private cage with A + B power; Remote Hands and Eyes billed hourly; high-density typically live in a few weeks

What does "Tier III designed" mean?

The Uptime Institute's Tier system runs from Tier I ("basic capacity") to Tier IV ("fault tolerant"). Tier III means "concurrently maintainable": components can be serviced without taking the site down. A design rating describes how the site was designed; a constructed-facility certification verifies the site as built (Uptime Institute). Ask each provider which one they hold.

How much power per rack should you plan for?

How do you run a colocation RFP?

  1. Define requirements: power (kW), density per rack, location, compliance obligations and growth over three years.
  2. Shortlist sites, not just providers: capabilities vary by building.
  3. Send the checklist above to every shortlisted provider and ask for written answers.
  4. Request a facility spec sheet for each site: as-built power, cooling, connectivity and compliance.
  5. Tour the site and meet the operations team.
  6. Compare like for like, then ask for pricing on the configuration you need.

Which Hut 8 site should you shortlist?

For the full network, see enterprise colocation in Canada. New to colocation? Start with the ultimate guide to colocation in Canada.

  1. How do I choose a colocation provider?

    Compare shortlisted sites on data residency, design standard, power per rack, cooling, power resilience, uptime SLA, connectivity, security, failover options and deployment time, using the same written questions for each.

  2. What should a colocation RFP include?

    Your power and density needs, location, compliance obligations and growth plans, plus a fixed set of questions every provider answers in writing.

  3. What is the difference between Tier I and Tier III?

    Under the Uptime Institute system, Tier I is basic capacity and Tier III is concurrently maintainable, meaning components can be serviced without an outage.

  4. What does carrier-neutral mean?

    A carrier-neutral data centre lets you choose among several network carriers rather than one.

  5. How long does it take to move into colocation?

    It depends on the configuration. At Hut 8, high-density deployments typically go live in a few weeks.

Unlock E-book

Download Now

Get the colocation evaluation guide

An 8-page guide to choosing a colocation provider in Canada: a 10-question checklist, the RFP steps, FAQs, and every Hut 8 Canada site compared on power, cooling, connectivity and security.

By submitting this form, you consent to receive emails from Hut 8. You can unsubscribe at any time. For more information, please review our Privacy Policy and Terms of Use.

Other Resources